| LARP Meeting October 19-21, 2004 Embassy Suites Napa Valley Hotel Phone number 707.253.9540 |
![]() |
Announcements:
There will be no registration fee.
The weather should be excellent and wineries will be in the midst of the crush. A great time to visit the Napa Valley!
You must make your reservation before September 18th to receive the special rate. Be sure to mention "LARP" when you register.
Please contact the meeting secretary, Cathy "Sam" Vanecek (CHVanecek@lbl.gov) to let her know you have registered. An agenda will be sent out shortly
Tuesday, Oct. 19th
| AM | OPENING PLENARY | |
| 9:00 | Welcome | S. Gourlay |
| 9:10 | Opening Remarks (LARP and Accelerator Systems) | S. Peggs (pdf) |
| 9:50 | Opening Remarks (Magnet Program) | S. Gourlay (pdf) |
| 10:10 | CERN Perspective and New Proposals | H. Schmickler |
| 10:40 | break - 1/2 hr | |
| 11:10 | Opening Remarks (Commissioning & AP) | M. Syphers |
| 11:25 | Opening Remarks (Instrumentation) | J. Byrd (pdf) |
| 11:40 | Opening Remarks (Collimation) | T. Markiewicz (pdf) |
| 12:00 | lunch - 1.5 hrs | |
| PM | Commissioning & Accelerator Physics | PM | IR Quadrupoles (A. Zlobin, chair) |
| 1:30 | Greeting & Session Overview, M. Syphers | 1:30 | Introduction, A. Zlobin (pdf) |
| 1:40 | LHC Commissioning Plans and Status, R. Bailey (pdf) | 1:40 | IR Quad Design Study Summary & Open Issues, V. Kashikhin (pdf) |
| 2:05 | IR Quad Design Study Summary & Open Issues, G. Sabbi (pdf) | ||
| 2:40 | LARP Magnet Commissioning Issues and Plan, M. Lamm (pdf)/ R. Saban (pdf) | 2:30 | IR Quad Model Magnet R&D, S. Caspi (pdf) |
| 3:25 | Comments and Discussion on LARP Beam and Non-Beam Commissioning, E. Harms (pdf) | 3:15 | break - 1/2 hr |
| 3:45 | break - 15 min | 3:45 | IR Quad Model Magnet R&D, A. Zlobin |
| 4:00 | Wire Compensation Report, T. Sen (pdf) | 4:15 | Sub-Scale Quad, P. Ferracin (pdf) |
| 4:30 | Report on Electron Cloud Activities, M. Furman (pdf) | ||
| 5:00 | Possible Loops for Global Decoupling, Y. Luo (pdf only) | 5:00 | General Discussion - open |
| 5:30 | General Discussion, M. Syphers | 6:00 | Adjourn |
| Wednesday, Oct. 20 | |||
| AM | Collimation (Markiewicz & Assman, co-chairs) | AM | Conductor and Cable R&D (G. Sabbi, chair) |
| 09:00 | Status of Phase I collimators at CERN, R. Assmann (pdf) | 09:00 | BNL, P. Wanderer (pdf) |
| 09:45 | Tracking Studies at BNL (Teapot Results & Plans for SixTrack/CollTrack), Angelika Drees (pdf) | 09:30 | FNAL, E. Barzi (pdf) |
| 10:00 | Phase II Tracking Studies at SLAC, Yunhai Cai(pdf) | 10:00 | LBNL, D. Dietderich (pdf) |
| 10:15 | break - 1/2 hr | 10:30 | break - 1/2 hr |
| 10:45 | Status & Plans of Collimation Studies at Fermilab, Nikolai Mokhov (pdf only) | 11:00 | Long Magnet Program (G. Sabbi, chair) Round Table Discussion |
| 11:00 | Phase II Energy Deposition Studies at SLAC, Tom Markiewicz (pdf) | ||
| 11:30 | Discussion of LARP Collimation Plans | ||
| 12:00 | lunch - 1.5 hrs | 12:00 | lunch - 1.5 hrs |
| PM | Instrumentation (J. Byrd & H Schmickler, co-chairs) | PM | Dipole Program (P. Wanderer, chair) |
| 1:30 | Progress of R&D on LHC Luminosity Monitor, J. Byrd (pdf) | 1:30 | Dipole for the LHC Upgrade, R. Gupta (pdf) |
| 2:00 | Upgrades of Luminosity Monitor Electronics, J.-F. Beche (pdf) | 2:15 | Simplified R&D models for the LHC Dipole-First IR, G. Sabbi (pdf) |
| 2:20 | Plans for Luminosity monitor production, A. Ratti (pdf) | ||
| 2:30 | Modeling of TAN detectors, S. White (pdf) | 2:45 | Energy Deposition Studies for the Dipole-First IR, N. Mokhov (pdf only) |
| 2:50 | Report on Abort Gap Monitor Techniqes, S. De Santis (pdf) | ||
| 3:15 | break | 3:15 | break |
| 3:30 | Status of LARP Tune Feedback, P. Cameron (pdf) | 3:45 | Dipole First - A Large Bore 15T Magnet, S. Caspi (pdf) |
| 4:15 | FNAL Tune Tracker Results, C.Y. Tan (pdf) | 4:15 | Topice for Dipole-Related Technology Development, P. Wanderer (pdf) |
| 4:35 | Engineering needs of a Schottky monitor, R. Pasquinelli (pdf) | 4:45 | Discussion |
| 5:00 | Physics design of Schottky monitor, A. Jansson | 5:15 | Magnet Steering Committee Meeting, S. Gourlay |
| 5:25 | BNL Schottky thoughts, P. Cameron (pdf) | ||
| ~ | dinner break | ||
Thursday, Oct. 21st
| AM | CLOSING PLENARY | |
| 8:00 | Magnet Technology Support | G. Sabbi (pdf) |
| 8:15 | Dipole Program | P. Wanderer (pdf) |
| 8:30 | Quadupole Program | A. Zlobin (pdf) |
| 8:45 | Magnet Program Summary | S. Gourlay (pdf) |
| 9:05 | Commissioning & AP | M. Syphers (pdf) |
| 9:20 | Instrumentation | J. Byrd |
| 9:35 | break - 1/2 hr | |
| 10:05 | Collimation | T. Markiewicz (pdf) |
| 10:20 | Closing Remarks | H. Schmickler (pdf) |
| 10:40 | Closing Remarks and Accelerator Systems Summary | S. Peggs (pdf) |
| 11:20 | Adjourn | |
Chair: Steve Gourlay |
Organization: Cathy "Sam" Vanecek |
Webmaster: Tom Gallant |
|
|
||